Steep slope · Dangerous

11/12 Roof Pitch

A 11/12 roof rises 11 inches for every 12 inches of horizontal run. That is a 42.51° angle, a grade of 91.7% and a roof area multiplier of 1.357, so every square foot of plan area becomes 1.357 square feet of roof surface.

42.51°run 12rise 11
Angle42.51°
Slope91.7%
Area multiplier1.357
Rise per metre917 mm
Rafter per ft of run16.28 in
Hip/valley per ft of run20.22 in

Rafter length for a 11/12 pitch

Multiply the horizontal run by 1.357. Every foot of run needs 16.28 inches of common rafter. Add the overhang (horizontal overhang × 1.357) and deduct half the ridge board thickness.

Building spanRun (½ span)Common rafterRidge rise
12 ft6 ft8 ft 1¾ in5 ft 6 in
16 ft8 ft10 ft 10¼ in7 ft 4 in
20 ft10 ft13 ft 6¾ in9 ft 2 in
24 ft12 ft16 ft 3¼ in11 ft 0 in
28 ft14 ft19 ft 0 in12 ft 10 in
32 ft16 ft21 ft 8½ in14 ft 8 in
36 ft18 ft24 ft 5 in16 ft 6 in
40 ft20 ft27 ft 1½ in18 ft 4 in

Gable roof, imperial. Rafter length is measured along the slope from wall plate to ridge centre line, before eave overhang and ridge board deduction.

Building spanRun (½ span)Common rafterRidge rise
4 m2 m2.71 m1.83 m
6 m3 m4.07 m2.75 m
8 m4 m5.43 m3.67 m
10 m5 m6.78 m4.58 m
12 m6 m8.14 m5.50 m

Gable roof, metric. Rafter length is measured along the slope from wall plate to ridge centre line, before eave overhang and ridge board deduction.

Roof area at 11/12

Roof surface area = plan area × 1.357. Use the roof calculator for multi-section roofs, waste and material costs.

Plan areaRoof surfaceSquares (+10%)Shingle bundles
1,000 sq ft1,357 sq ft14.945
1,500 sq ft2,035 sq ft22.468
2,000 sq ft2,713 sq ft29.890
2,500 sq ft3,391 sq ft37.3112
3,000 sq ft4,070 sq ft44.8135

Plan area includes eave overhangs. Bundles assume 3 bundles per square (100 sq ft) with 10% waste; hips, valleys and dormers need more.

Plan areaRoof surfaceWith 10% waste
80 m²108.5 m²119.4 m²
100 m²135.7 m²149.2 m²
150 m²203.5 m²223.8 m²
200 m²271.3 m²298.4 m²
250 m²339.1 m²373.1 m²

Plan area is the footprint measured to the outside of the eaves. Multiply by 1.357 for the sloped surface.

Roofing materials for a 11/12 pitch (US & Canada)

Minimum slopes from the 2021 International Residential Code. Canadian codes and manufacturers use similar limits for shingles and metal. Minimum pitch by material →

Roofing systemAt this pitchCode section
Asphalt shinglesMeets the 2/12 minimumIRC R905.2.2
Clay & concrete tileMeets the 2½/12 minimumIRC R905.3.2
Metal roof shinglesMeets the 3/12 minimumIRC R905.4.2
Slate & slate-type shinglesMeets the 4/12 minimumIRC R905.6.2
Wood shingles & shakesMeets the 3/12 minimumIRC R905.7.2 / R905.8.2
Standing-seam metal panelsMeets the ¼/12 minimumIRC R905.10.2
Lapped (exposed-fastener) metal panelsMeets the ½/12 minimumIRC R905.10.2
Mineral-surfaced roll roofingMeets the 1/12 minimumIRC R905.5.2
Membranes (TPO, EPDM, modified bitumen, built-up)Allowed, but normally used on low-slope roofsIRC R905.9–R905.13

Roofing materials for a 11/12 pitch (Australia & UK)

Typical manufacturer minimums. Check the specific product, sheet thickness, rafter length and exposure before ordering.

Roofing systemAt this pitchNotes
Concealed-fix steel deck (e.g. Lysaght Klip-Lok 700)Meets the typical 1° minimum1° applies to thicker sheet; 0.42 BMT is generally 2°.
Trapezoidal steel sheet (e.g. Lysaght Trimdek)Meets the typical 2° minimum—
Corrugated steel sheet (e.g. Lysaght Custom Orb)Meets the typical 5° minimum—
Interlocking concrete or terracotta tilesMeets the typical 15° minimumProfile dependent; many UK interlocking tiles need 17.5°–22.5°.
Natural slateMeets the typical 20° minimumTypical for larger slates; smaller slates and exposed sites need steeper pitches.
Plain tiles (clay or concrete)Meets the typical 35° minimumSome products allow 30°.
Flat-roof membranes (EPDM, single-ply, felt)Usually reserved for flat and low-slope roofsDesigned for a finished fall of about 1:80 (0.7°) or more.

Is a 11/12 roof steep?

Steep roofs shed water and snow quickly and give attic space, but installation needs staging and fall protection, which raises labour cost per square.

A 11/12 roof cannot be walked. All work needs roof jacks or staging plus a personal fall arrest system.

11/12 roof pitch FAQ

What is a 11/12 roof pitch in degrees?

A 11/12 pitch is 42.51°. It rises 11 inches per 12 inches of run, so the angle is arctan(11 ÷ 12). As a percentage that is a slope of 91.7%, and in metric it rises 917 mm per metre.

What is the roof pitch multiplier for 11/12?

The 11/12 multiplier is 1.357. Multiply the roof's plan (footprint) area by 1.357 to get the sloped surface area. A 2,000 sq ft plan area, for example, is 2,713 sq ft of roof before waste.

How do I calculate rafter length for a 11/12 pitch?

Multiply the horizontal run by 1.357. Each foot of run needs 16.28 inches of rafter, so a 24 ft wide gable (12 ft run) needs a common rafter of about 16 ft 3¼ in before adding the overhang and deducting half the ridge board. Hip and valley rafters on a regular hip roof need 20.22 inches per foot of common run.

Can you walk on a 11/12 roof?

A 11/12 roof cannot be walked. All work needs roof jacks or staging plus a personal fall arrest system. OSHA (29 CFR 1926.500) treats any roof steeper than 4/12 as a steep roof for fall protection purposes.

What roofing materials can go on a 11/12 pitch?

Under the US International Residential Code a 11/12 pitch meets the minimum slope for asphalt shingles, clay & concrete tile, metal roof shingles, slate & slate-type shingles, wood shingles & shakes, standing-seam metal panels, lapped (exposed-fastener) metal panels and mineral-surfaced roll roofing. Always check the manufacturer's installation instructions and your local code.