Very steep slope · Dangerous

13/12 Roof Pitch

A 13/12 roof rises 13 inches for every 12 inches of horizontal run. That is a 47.29° angle, a grade of 108.3% and a roof area multiplier of 1.474, so every square foot of plan area becomes 1.474 square feet of roof surface.

47.29°run 12rise 13
Angle47.29°
Slope108.3%
Area multiplier1.474
Rise per metre1,083 mm
Rafter per ft of run17.69 in
Hip/valley per ft of run21.38 in

Rafter length for a 13/12 pitch

Multiply the horizontal run by 1.474. Every foot of run needs 17.69 inches of common rafter. Add the overhang (horizontal overhang × 1.474) and deduct half the ridge board thickness.

Building spanRun (½ span)Common rafterRidge rise
12 ft6 ft8 ft 10¼ in6 ft 6 in
16 ft8 ft11 ft 9½ in8 ft 8 in
20 ft10 ft14 ft 9 in10 ft 10 in
24 ft12 ft17 ft 8¼ in13 ft 0 in
28 ft14 ft20 ft 7¾ in15 ft 2 in
32 ft16 ft23 ft 7 in17 ft 4 in
36 ft18 ft26 ft 6½ in19 ft 6 in
40 ft20 ft29 ft 5¾ in21 ft 8 in

Gable roof, imperial. Rafter length is measured along the slope from wall plate to ridge centre line, before eave overhang and ridge board deduction.

Building spanRun (½ span)Common rafterRidge rise
4 m2 m2.95 m2.17 m
6 m3 m4.42 m3.25 m
8 m4 m5.90 m4.33 m
10 m5 m7.37 m5.42 m
12 m6 m8.85 m6.50 m

Gable roof, metric. Rafter length is measured along the slope from wall plate to ridge centre line, before eave overhang and ridge board deduction.

Roof area at 13/12

Roof surface area = plan area × 1.474. Use the roof calculator for multi-section roofs, waste and material costs.

Plan areaRoof surfaceSquares (+10%)Shingle bundles
1,000 sq ft1,474 sq ft16.249
1,500 sq ft2,211 sq ft24.373
2,000 sq ft2,949 sq ft32.498
2,500 sq ft3,686 sq ft40.5122
3,000 sq ft4,423 sq ft48.7146

Plan area includes eave overhangs. Bundles assume 3 bundles per square (100 sq ft) with 10% waste; hips, valleys and dormers need more.

Plan areaRoof surfaceWith 10% waste
80 m²117.9 m²129.7 m²
100 m²147.4 m²162.2 m²
150 m²221.1 m²243.3 m²
200 m²294.9 m²324.3 m²
250 m²368.6 m²405.4 m²

Plan area is the footprint measured to the outside of the eaves. Multiply by 1.474 for the sloped surface.

Roofing materials for a 13/12 pitch (US & Canada)

Minimum slopes from the 2021 International Residential Code. Canadian codes and manufacturers use similar limits for shingles and metal. Minimum pitch by material →

Roofing systemAt this pitchCode section
Asphalt shinglesMeets the 2/12 minimumIRC R905.2.2
Clay & concrete tileMeets the 2½/12 minimumIRC R905.3.2
Metal roof shinglesMeets the 3/12 minimumIRC R905.4.2
Slate & slate-type shinglesMeets the 4/12 minimumIRC R905.6.2
Wood shingles & shakesMeets the 3/12 minimumIRC R905.7.2 / R905.8.2
Standing-seam metal panelsMeets the ¼/12 minimumIRC R905.10.2
Lapped (exposed-fastener) metal panelsMeets the ½/12 minimumIRC R905.10.2
Mineral-surfaced roll roofingMeets the 1/12 minimumIRC R905.5.2
Membranes (TPO, EPDM, modified bitumen, built-up)Allowed, but normally used on low-slope roofsIRC R905.9–R905.13

Roofing materials for a 13/12 pitch (Australia & UK)

Typical manufacturer minimums. Check the specific product, sheet thickness, rafter length and exposure before ordering.

Roofing systemAt this pitchNotes
Concealed-fix steel deck (e.g. Lysaght Klip-Lok 700)Meets the typical 1° minimum1° applies to thicker sheet; 0.42 BMT is generally 2°.
Trapezoidal steel sheet (e.g. Lysaght Trimdek)Meets the typical 2° minimum—
Corrugated steel sheet (e.g. Lysaght Custom Orb)Meets the typical 5° minimum—
Interlocking concrete or terracotta tilesMeets the typical 15° minimumProfile dependent; many UK interlocking tiles need 17.5°–22.5°.
Natural slateMeets the typical 20° minimumTypical for larger slates; smaller slates and exposed sites need steeper pitches.
Plain tiles (clay or concrete)Meets the typical 35° minimumSome products allow 30°.
Flat-roof membranes (EPDM, single-ply, felt)Usually reserved for flat and low-slope roofsDesigned for a finished fall of about 1:80 (0.7°) or more.

Is a 13/12 roof steep?

Very steep roofs are mostly architectural: A-frames, Gothic and Tudor styles, and dormers. Expect a steep-slope labour surcharge on every quote.

A 13/12 roof cannot be walked. All work needs roof jacks or staging plus a personal fall arrest system.

13/12 roof pitch FAQ

What is a 13/12 roof pitch in degrees?

A 13/12 pitch is 47.29°. It rises 13 inches per 12 inches of run, so the angle is arctan(13 ÷ 12). As a percentage that is a slope of 108.3%, and in metric it rises 1,083 mm per metre.

What is the roof pitch multiplier for 13/12?

The 13/12 multiplier is 1.474. Multiply the roof's plan (footprint) area by 1.474 to get the sloped surface area. A 2,000 sq ft plan area, for example, is 2,949 sq ft of roof before waste.

How do I calculate rafter length for a 13/12 pitch?

Multiply the horizontal run by 1.474. Each foot of run needs 17.69 inches of rafter, so a 24 ft wide gable (12 ft run) needs a common rafter of about 17 ft 8¼ in before adding the overhang and deducting half the ridge board. Hip and valley rafters on a regular hip roof need 21.38 inches per foot of common run.

Can you walk on a 13/12 roof?

A 13/12 roof cannot be walked. All work needs roof jacks or staging plus a personal fall arrest system. OSHA (29 CFR 1926.500) treats any roof steeper than 4/12 as a steep roof for fall protection purposes.

What roofing materials can go on a 13/12 pitch?

Under the US International Residential Code a 13/12 pitch meets the minimum slope for asphalt shingles, clay & concrete tile, metal roof shingles, slate & slate-type shingles, wood shingles & shakes, standing-seam metal panels, lapped (exposed-fastener) metal panels and mineral-surfaced roll roofing. Always check the manufacturer's installation instructions and your local code.