Steep slope · Steep

9/12 Roof Pitch

A 9/12 roof rises 9 inches for every 12 inches of horizontal run. That is a 36.87° angle, a grade of 75.0% and a roof area multiplier of 1.250, so every square foot of plan area becomes 1.250 square feet of roof surface.

36.87°run 12rise 9
Angle36.87°
Slope75.0%
Area multiplier1.250
Rise per metre750 mm
Rafter per ft of run15.00 in
Hip/valley per ft of run19.21 in

Rafter length for a 9/12 pitch

Multiply the horizontal run by 1.250. Every foot of run needs 15.00 inches of common rafter. Add the overhang (horizontal overhang × 1.250) and deduct half the ridge board thickness.

Building spanRun (½ span)Common rafterRidge rise
12 ft6 ft7 ft 6 in4 ft 6 in
16 ft8 ft10 ft 0 in6 ft 0 in
20 ft10 ft12 ft 6 in7 ft 6 in
24 ft12 ft15 ft 0 in9 ft 0 in
28 ft14 ft17 ft 6 in10 ft 6 in
32 ft16 ft20 ft 0 in12 ft 0 in
36 ft18 ft22 ft 6 in13 ft 6 in
40 ft20 ft25 ft 0 in15 ft 0 in

Gable roof, imperial. Rafter length is measured along the slope from wall plate to ridge centre line, before eave overhang and ridge board deduction.

Building spanRun (½ span)Common rafterRidge rise
4 m2 m2.50 m1.50 m
6 m3 m3.75 m2.25 m
8 m4 m5.00 m3.00 m
10 m5 m6.25 m3.75 m
12 m6 m7.50 m4.50 m

Gable roof, metric. Rafter length is measured along the slope from wall plate to ridge centre line, before eave overhang and ridge board deduction.

Roof area at 9/12

Roof surface area = plan area × 1.250. Use the roof calculator for multi-section roofs, waste and material costs.

Plan areaRoof surfaceSquares (+10%)Shingle bundles
1,000 sq ft1,250 sq ft13.842
1,500 sq ft1,875 sq ft20.662
2,000 sq ft2,500 sq ft27.583
2,500 sq ft3,125 sq ft34.4104
3,000 sq ft3,750 sq ft41.3124

Plan area includes eave overhangs. Bundles assume 3 bundles per square (100 sq ft) with 10% waste; hips, valleys and dormers need more.

Plan areaRoof surfaceWith 10% waste
80 m²100.0 m²110.0 m²
100 m²125.0 m²137.5 m²
150 m²187.5 m²206.3 m²
200 m²250.0 m²275.0 m²
250 m²312.5 m²343.8 m²

Plan area is the footprint measured to the outside of the eaves. Multiply by 1.250 for the sloped surface.

Roofing materials for a 9/12 pitch (US & Canada)

Minimum slopes from the 2021 International Residential Code. Canadian codes and manufacturers use similar limits for shingles and metal. Minimum pitch by material →

Roofing systemAt this pitchCode section
Asphalt shinglesMeets the 2/12 minimumIRC R905.2.2
Clay & concrete tileMeets the 2½/12 minimumIRC R905.3.2
Metal roof shinglesMeets the 3/12 minimumIRC R905.4.2
Slate & slate-type shinglesMeets the 4/12 minimumIRC R905.6.2
Wood shingles & shakesMeets the 3/12 minimumIRC R905.7.2 / R905.8.2
Standing-seam metal panelsMeets the ¼/12 minimumIRC R905.10.2
Lapped (exposed-fastener) metal panelsMeets the ½/12 minimumIRC R905.10.2
Mineral-surfaced roll roofingMeets the 1/12 minimumIRC R905.5.2
Membranes (TPO, EPDM, modified bitumen, built-up)Allowed, but normally used on low-slope roofsIRC R905.9–R905.13

Roofing materials for a 9/12 pitch (Australia & UK)

Typical manufacturer minimums. Check the specific product, sheet thickness, rafter length and exposure before ordering.

Roofing systemAt this pitchNotes
Concealed-fix steel deck (e.g. Lysaght Klip-Lok 700)Meets the typical 1° minimum1° applies to thicker sheet; 0.42 BMT is generally 2°.
Trapezoidal steel sheet (e.g. Lysaght Trimdek)Meets the typical 2° minimum—
Corrugated steel sheet (e.g. Lysaght Custom Orb)Meets the typical 5° minimum—
Interlocking concrete or terracotta tilesMeets the typical 15° minimumProfile dependent; many UK interlocking tiles need 17.5°–22.5°.
Natural slateMeets the typical 20° minimumTypical for larger slates; smaller slates and exposed sites need steeper pitches.
Plain tiles (clay or concrete)Meets the typical 35° minimumSome products allow 30°.
Flat-roof membranes (EPDM, single-ply, felt)Usually reserved for flat and low-slope roofsDesigned for a finished fall of about 1:80 (0.7°) or more.

Is a 9/12 roof steep?

Steep roofs shed water and snow quickly and give attic space, but installation needs staging and fall protection, which raises labour cost per square.

A 9/12 roof is too steep to walk normally. Roofers work it from roof jacks or toe boards with a personal fall arrest system.

9/12 roof pitch FAQ

What is a 9/12 roof pitch in degrees?

A 9/12 pitch is 36.87°. It rises 9 inches per 12 inches of run, so the angle is arctan(9 ÷ 12). As a percentage that is a slope of 75.0%, and in metric it rises 750 mm per metre.

What is the roof pitch multiplier for 9/12?

The 9/12 multiplier is 1.250. Multiply the roof's plan (footprint) area by 1.250 to get the sloped surface area. A 2,000 sq ft plan area, for example, is 2,500 sq ft of roof before waste.

How do I calculate rafter length for a 9/12 pitch?

Multiply the horizontal run by 1.250. Each foot of run needs 15.00 inches of rafter, so a 24 ft wide gable (12 ft run) needs a common rafter of about 15 ft 0 in before adding the overhang and deducting half the ridge board. Hip and valley rafters on a regular hip roof need 19.21 inches per foot of common run.

Can you walk on a 9/12 roof?

A 9/12 roof is too steep to walk normally. Roofers work it from roof jacks or toe boards with a personal fall arrest system. OSHA (29 CFR 1926.500) treats any roof steeper than 4/12 as a steep roof for fall protection purposes.

What roofing materials can go on a 9/12 pitch?

Under the US International Residential Code a 9/12 pitch meets the minimum slope for asphalt shingles, clay & concrete tile, metal roof shingles, slate & slate-type shingles, wood shingles & shakes, standing-seam metal panels, lapped (exposed-fastener) metal panels and mineral-surfaced roll roofing. Always check the manufacturer's installation instructions and your local code.